{"id":101,"date":"2026-01-17T01:49:02","date_gmt":"2026-01-17T01:49:02","guid":{"rendered":"https:\/\/diariosur.com.do\/?p=101"},"modified":"2026-01-17T01:49:02","modified_gmt":"2026-01-17T01:49:02","slug":"eted-fortalece-la-infraestructura-electrica-con-trabajos-programados-en-la-linea-de-transmision-138-kv-cnp-paraiso","status":"publish","type":"post","link":"https:\/\/diariosur.com.do\/?p=101","title":{"rendered":"ETED fortalece la infraestructura el\u00e9ctrica con trabajos programados en la l\u00ednea de transmisi\u00f3n 138 kV CNP\u2013Para\u00edso"},"content":{"rendered":"<p>16 de Enero del 2026<\/p>\n<p>La Empresa de Transmisi\u00f3n El\u00e9ctrica Dominicana (ETED) informa que este domingo 18 de enero, en horario de 7:00 de la ma\u00f1ana a 3:00 de la tarde, se estar\u00e1n realizando trabajos t\u00e9cnicos en la l\u00ednea de transmisi\u00f3n 138 kV CNP\u2013Para\u00edso, como parte de las acciones orientadas a fortalecer la infraestructura del sistema el\u00e9ctrico nacional.<\/p>\n<p>Estos trabajos tienen como objetivo crear las condiciones t\u00e9cnicas y operativas necesarias para facilitar el retiro del autotransformador existente en la subestaci\u00f3n Metropolitano y la posterior instalaci\u00f3n de una nueva unidad, contribuyendo as\u00ed a mejorar la confiabilidad y eficiencia del servicio el\u00e9ctrico.<\/p>\n<p>Como resultado de estas labores, se registrar\u00e1n interrupciones transitorias del servicio el\u00e9ctrico, con una duraci\u00f3n aproximada de 45 minutos al inicio y al final de los trabajos, que afectar\u00e1n de manera parcial a los sectores Naco, Piantini, Ensanche La Fe, Cristo Rey, Ensanche Kennedy, Arroyo Hondo, Ensanche Para\u00edso, La Esperilla y Zona Universitaria, todos pertenecientes al Distrito Nacional.<\/p>\n<p>La ETED reitera que estas acciones forman parte de su compromiso permanente con el fortalecimiento del sistema de transmisi\u00f3n, la seguridad operativa y la mejora continua del suministro el\u00e9ctrico, al tiempo que agradece la comprensi\u00f3n de la ciudadan\u00eda ante los inconvenientes temporales que puedan generarse.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>16 de Enero del 2026 La Empresa de Transmisi\u00f3n El\u00e9ctrica Dominicana (ETED) informa que este<\/p>\n","protected":false},"author":1,"featured_media":102,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-101","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales"],"_links":{"self":[{"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/posts\/101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101"}],"version-history":[{"count":1,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/posts\/101\/revisions"}],"predecessor-version":[{"id":103,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/posts\/101\/revisions\/103"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=\/wp\/v2\/media\/102"}],"wp:attachment":[{"href":"https:\/\/diariosur.com.do\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/diariosur.com.do\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}